# SDR RAIA2010011700002

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 17, 2010
- Submitted: January 25, 2010
- Operation: Air carrier
- Aircraft: N811HK
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145256
- Aircraft time: 23,257 hours, 19,927 cycles
- System (JASC): [3350 · Emergency Lighting](https://openairdocs.org/jasc/3350)
- Part: Power Supply
- Part number: RPS1B
- Condition: Discharged
- Location: Cabin
- Stage of operation: IN
- How discovered: C
- Nature of condition: L
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/RAIA2010011700002

## Discrepancy

DURING THE PRE FLIGHT INSPECTION, THE CREW REPORTED SEVERAL EMERGENCY LIGHTS AS BEING INOPERATIVE.  MAINTENANCE REMOVED AND REPLACED THE NR 3 EMERGENCY LIGHT POWER SUPPLY IAW AMM PROCEDURES.  OPS CHECKED GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
