# SDR RAIA2011022300001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 23, 2011
- Submitted: March 1, 2011
- Operation: Air carrier
- Aircraft: N840HK
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145341
- Aircraft time: 24,425 hours, 22,218 cycles
- System (JASC): [3620 · Pneumatic Indicating System](https://openairdocs.org/jasc/3620)
- Part: Thermostat
- Part number: 81662413
- Condition: Inoperative
- Location: Bleed Air Sys
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/RAIA2011022300001

## Discrepancy

DURING CLIMB, CREW RECEIVED A BLEED 1 OVERTEMP MESSAGE ON THE EICAS.  MAINTENANCE REMOVED AND REPLACED THE THERMOSTAT FAN AIR CONTROL VALVE.  SYSTEM OPS CHECKED GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
