# SDR RAIA201110010001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 1, 2011
- Submitted: October 4, 2011
- Operation: Air carrier
- Aircraft: N801HK
- Make and model: Emb EMB-145EP
- Registry model: [EMB EMB-145EP](https://openairdocs.org/model/embraer-emb-145ep) (OpenAirDocs)
- Aircraft serial: 145053
- Aircraft time: 30,511 hours, 27,925 cycles
- System (JASC): [2697 · Fire Protection System Wiring](https://openairdocs.org/jasc/2697)
- Part: Wire
- Condition: Shorted
- Location: Cargo Bay
- Stage of operation: CL
- How discovered: O
- Nature of condition: N
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/RAIA201110010001

## Discrepancy

SEE SDR REPORT RAIA201109300002.  AIRCRAFT WAS DEFERRED FOR BAGGAGE COMPARTMENT SMOKE MESSAGE ON THE EICAS IN PIT.  AIRCRAFT WAS FERRIED TO STL.  MAINTENANCE RANG OUT WIRES FROM PIN NR 5 ON BOTH SMOKE DETECTORS TO PIN A28 ON THE DAU.  PIN RING OUT WAS GOOD.  REMOVED AND REPLACED NR 2 SMOKE DETECTOR, BOTH BAGGAGE COMPARTMENT FIRE BOTTLES & BAGGAGE COMPARTMENT SMOKE TEST RELAY K0129.  OPS CHECK OF CARGO SMOKE DETECTION SYSTEM WAS GOOD.  AIRCRAFT FLEW A CHECK FLIGHT AND THE CHECK FLIGHT WAS GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
