# SDR RAIA201801310002

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 31, 2018
- Submitted: February 3, 2018
- Operation: Air carrier
- Aircraft: [N619AE](https://openairdocs.org/aircraft/N619AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145101
- Aircraft time: 42,386 hours, 38,584 cycles
- System (JASC): [3610 · Pneumatic Distribution System](https://openairdocs.org/jasc/3610)
- Part: Clamp
- Condition: Loose
- Location: Bleed Air Sys
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/RAIA201801310002

## Discrepancy

BLEED 2 LEAK ON CLIMB OUT FOUND HIGH STAGE VLV CLAMP LOOSE AND TIGHTENED. FOUND BLEED VALVE NR 2 CLAMP LOOSE AND TIGHTENED. RAN THE LEAK CHECK AT 90%. NO LEAKS NOTED AT THIS TIME.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
