# SDR RAIA2019122708030

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 8, 2019
- Submitted: December 27, 2019
- Operation: Air carrier
- Aircraft: [N11113](https://openairdocs.org/aircraft/N11113), registered now
- Make and model: Emb EMB-145XR
- Registry model: [EMB EMB-145XR](https://openairdocs.org/model/embraer-emb-145xr) (OpenAirDocs)
- Aircraft serial: 145662
- Aircraft time: 44,569 hours, 27,700 cycles
- System (JASC): [5315 · Fuselage Main, Floor Beam](https://openairdocs.org/jasc/5315)
- Part: Floorbeam
- Condition: Corroded
- Location: Frame 59
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/RAIA2019122708030

## Discrepancy

CENTER OMEGA BEAM HAS CORROSION AT FR 59 BETWEEN UPPER DIGITAL & FLOOR BEAM AROUND NUTPLATE HOLE-          PERFORMED CUT OUT OF CORROSION AROUND THE NUTPLATE AT FR 59 ON THE CENTER OMEGA BEAM. MANUFACTURED DOUBLER FOR THE CENTER OMEGA BEAM REPAIR AT FR 59 & INSTALLED IT, NEEDS NUTPLATE INSTALLED. INSTALLED NUTPLATES ON CENTER OMEGA BEAM AT FR 59, INSTALLED UPPER DIGITAL AT FR 59 CENTER OMEGA BEAM.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
