# SDR RAIA2020020162003

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 2, 2020
- Submitted: February 16, 2020
- Operation: Air carrier
- Aircraft: [N11150](https://openairdocs.org/aircraft/N11150), registered now
- Make and model: Emb EMB-145XR
- Registry model: [EMB EMB-145XR](https://openairdocs.org/model/embraer-emb-145xr) (OpenAirDocs)
- Aircraft serial: 145756
- Aircraft time: 42,421 hours, 26,493 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Gusset
- Condition: Corroded
- Location: Frame 40
- Stage of operation: IN
- How discovered: O
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/RAIA2020020162003

## Discrepancy

R/H CENTER OMEGA BEAM GUSSET AT FRAME 40 SHOWS SIGNS OF CORROSION............... REMOVED AND REPLACED R/H CENTER OMEGA BEAM GUSSET AT FRAME 40

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
