# SDR REXA201100625

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 26, 2011
- Submitted: September 30, 2011
- Operation: Air carrier
- Aircraft: N8883E
- Make and model: Cndair CL6002B19
- Aircraft serial: 7883
- Aircraft time: 17,884 hours, 15,364 cycles
- System (JASC): [2824 · Fuel Transfer Valve](https://openairdocs.org/jasc/2824)
- Part: Unknown
- Condition: Out Of Adjust
- Location: Fuel System
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/REXA201100625

## Discrepancy

XFLOW/APU PUMP CAUTION ON THE WHOLE FLIGHT AFTER APU SHUTDOWN MSG CLEARED WHEN APU STARTED FOR LANDING.  ADJ/TEST APU XFLOW GOOD AT THIS TIME IAW AMM 28-24-01.  OK FOR SVC.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
