# SDR RRXA97318

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 3, 1997
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: [N995CF](https://openairdocs.org/aircraft/N995CF), registered now
- Make and model: Doug DC-8-62
- Registry model: [Doug DC-8-62](https://openairdocs.org/model/mcdonnell-douglas-dc-8-62) (OpenAirDocs)
- Aircraft serial: 46024
- System (JASC): [2844 · Fuel Pressure Indicator](https://openairdocs.org/jasc/2844)
- Part: O-Ring
- Condition: Cut
- Location: Fuel Press Line
- Stage of operation: CL
- Nature of condition: K, J
- Precautionary procedure: A, E
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/RRXA97318

## Discrepancy

REPORT FROM TOWER OF FUEL COMING FROM NR 2 ENGINE AFTER TAKEOFF.  NR 2 FUEL FLOW 4000 NR HR HIGHER THAN OTHERS.  ON REDUCTION OF THROTTLE NR 2 ENGINE STOPPED PRODUCING THRUST/FLAMEOUT, WENT THROUGH PRECAUTIONARY IN FLIGHT ENGINE SHUTDOWN PROCEDURE AT 1615Z AS PER QRH.  FOUND NR 2 ENGINE FUEL PRESSURE AND PUMP VALVE IN LINE, NUTS HAD BACKED OF TO THE POINT OF EXPOSING O-RING.  ALSO, FOUND O-RING CUT IN HALF.  REMOVED AND REPLACED O-RING AND FLANGE NUTS, RESECURED IN LINE TO VALVE, OPS AND LEAK CHECKS GOOD ON GROUND ENGINE RUN-UP IAW DC-8 JET RUN-UP HANDBOOK, NO DEFECTS.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
