# SDR SCNA20130128023

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 26, 2013
- Submitted: January 28, 2013
- Operation: Air carrier
- Aircraft: [N813SY](https://openairdocs.org/aircraft/N813SY), registered now
- Make and model: Boeing 737-8Q8
- Registry model: [Boeing 737-8Q8](https://openairdocs.org/model/boeing-737-8q8) (OpenAirDocs)
- Aircraft serial: 28237
- Aircraft time: 39,151 hours, 14,647 cycles
- System (JASC): [5322 · Fuselage Internal Mounting Structure](https://openairdocs.org/jasc/5322)
- Part: Shear Tie
- Condition: Cracked
- Location: Fuselage
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SCNA20130128023

## Discrepancy

DURING GVI OF THE WING BOX SHEAR TIE FITTING, FOUND CRACK AFT OF FASTENER HOLE TO EDGE FITTING AT STA 548 /LBL 16.  HFEC INSPECTION OF SHEAR TIE CONFIRMED CRACK.  REMOVED & REPLACED SHEAR TIE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
