# SDR SCNA20201008119

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 21, 2020
- Submitted: October 8, 2020
- Operation: Air carrier
- Aircraft: [N801SY](https://openairdocs.org/aircraft/N801SY), registered now
- Make and model: Boeing 737-8Q8
- Registry model: [Boeing 737-8Q8](https://openairdocs.org/model/boeing-737-8q8) (OpenAirDocs)
- Aircraft serial: 30332
- Aircraft time: 63,730 hours, 24,799 cycles
- System (JASC): [5511 · Horizontal Stabilizer, Spar/Rib](https://openairdocs.org/jasc/5511)
- Part: Rib
- Condition: Cracked
- Location: Horizontal Stab
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SCNA20201008119

## Discrepancy

RT HORIZONTAL STABILIZER RIB AT STAB STA 92.7, 2ND STIFFENER ARE CRACKED AT THE BOTTOM.  REPAIRED RT HORIZ STAB RIB AT STAB STA 92.7, 2ND STIFFENER, IAW SRM 55-10-09-2R-4.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
