# SDR SCNA97296

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 14, 1997
- Submitted: March 26, 2000
- Operation: Air carrier
- Aircraft: [N151SY](https://openairdocs.org/aircraft/N151SY), registered now
- Make and model: Doug DC-10-15
- Registry model: [Doug DC-10-15](https://openairdocs.org/model/mcdonnell-douglas-dc-10-15) (OpenAirDocs)
- Aircraft serial: 48295
- System (JASC): [3350 · Emergency Lighting](https://openairdocs.org/jasc/3350)
- Part: Power Supply
- Part number: EMBS1392
- Condition: Inoperative
- Location: Cabin
- Component: Gulton
- Stage of operation: IN
- Nature of condition: L
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SCNA97296

## Discrepancy

THE OVERWING EMERGENCY LIGHT POWER SUPPLY DOES NOT PASS THE EMERGENCY LIGHT TEST.  REMOVED AND REPLACED THE POWER SUPPLY AND BATTERY PACK, SYSTEM TESTED GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
