# SDR SIMA200721805

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 4, 2007
- Submitted: August 6, 2007
- Operation: Air carrier
- Aircraft: [N933JN](https://openairdocs.org/aircraft/N933JN), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 14500918
- Aircraft time: 5,716 hours, 5,025 cycles
- System (JASC): [2430 · DC Generating System](https://openairdocs.org/jasc/2430)
- Part: Contactor
- Part number: 806CC01
- Condition: Failed
- Location: Essential Buss
- Part time: 5,716 hours, 5,025 cycles
- Stage of operation: CR
- How discovered: V
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA200721805

## Discrepancy

RECEIVED EMERGENCY ABNORMAL AND EMERGENCY LIGHT NOT ARMED MESSAGE.  ALL FOUR GENERATORS AMPS DOUBLED AFTER APU START, DIVERTED TO GGG.  REMOVED AND REPLACED NR 2 ESSENTIAL BUSS CONTACTOR IAW EMB AMM 24-60-03 AND ESSENTIAL TIMER RELAY ONE IAW EMB AMM 20-13-02.  ALL OPERATIONAL CHECKS GOOD.  AIRCRAFT RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
