# SDR SIMA201023002

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 15, 2010
- Submitted: August 18, 2010
- Operation: Air carrier
- Aircraft: [N682AE](https://openairdocs.org/aircraft/N682AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 14500826
- Aircraft time: 15,511 hours, 13,790 cycles
- Engine: Rroyce AE3007A12
- Engine time: 20,134 hours, 17,080 cycles
- System (JASC): [7321 · Fuel Control/Turbine Engines](https://openairdocs.org/jasc/7321)
- Part: Metering Unit
- Part number: 77154580
- Condition: Failed
- Location: Nr 2 Engine
- Stage of operation: CR
- How discovered: O
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA201023002

## Discrepancy

ON FLIGHT 3924 DURING CRUISE THE CREW REPORTED AT FLIGHT LEVEL 240 THE NR 2 ENGINE SURGED CONTINUOUSLY FOR APPROXIMATELY 2 MINUTES WHILE ALL OTHER INDICATIONS WERE NORMAL.  LARGE FLUCTUATIONS N1, N2 & ITT, IGNITION AB DISPLAYED AS IF IT WAS TRYING TO RELIGHT AFTER 2 MINUTES EVERYTHING STABILIZED AND MAINTAINED NORMAL VALUES.  THE AIRCRAFT LANDED WITHOUT INCIDENT.  THE AIRCRAFT WAS REMOVED FROM SERVICE. COMPLIED WITH ROLLS-ROYCE AE3007A FIM TASK 72-00-00-810-804 "THRUST OSCILLATIONS/FLUCTUATIONS" AND REMOVED AND REPLACED ENGINE 2 FUEL PUMP METER UNIT IAW RR MM 73-21-10.  THE OPERATIONAL TESTS WERE SATISFACTORY.  THE AIRCRAFT WAS RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
