# SDR SIMA20130724005

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 24, 2013
- Submitted: August 7, 2013
- Operation: Air carrier
- Aircraft: [N621AE](https://openairdocs.org/aircraft/N621AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145105
- Aircraft time: 33,622 hours, 31,663 cycles
- System (JASC): [7314 · Engine Fuel Pump](https://openairdocs.org/jasc/7314)
- Part: Pump
- Part number: 23076368
- Part serial: BAE11999
- Condition: Inoperative
- Location: Nr 2 Engine Fuel
- Stage of operation: DE
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA20130724005

## Discrepancy

THE CREW REPORTED THE NR 2 ENGINE DURING ARE DECENT SURGED POWER AND IGNITIONS SWITCH BETWEEN A AND B ALL OTHER ENG IND WERE NORMAL.  THE ACFT LANDED WITHOUT INCIDENT.  THE ACFT WAS REMOVED FROM SERVICE.  R & R NR 2 ENGINE FUEL PUMP METERING UNIT IAW MM 73-21-10-000-801.  THE OPS CHECK WAS GOOD.  NO FAULTS FOUND.  THE ACFT WAS RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
