# SDR SIMA20130805001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 2, 2013
- Submitted: August 5, 2013
- Operation: Air carrier
- Aircraft: [N933JN](https://openairdocs.org/aircraft/N933JN), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 14500918
- Aircraft time: 21,884 hours, 18,074 cycles
- System (JASC): [3697 · Pneumatic System Wiring](https://openairdocs.org/jasc/3697)
- Part: Wire
- Condition: Broken
- Location: Thermoswitch
- Stage of operation: CR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA20130805001

## Discrepancy

DURING CRUISE,  FL 280, EXPERIENCED A SYS 2 BLEED LEAKING WARNING.  APPLIED AOM VOL 1 PROCEDURES AND WERE UNABLE TO RESOLVE ANOMALY.  DIVERTED.  A CHECKLIST DRIVEN "PRECAUTIONARY" ENGINE SHUTDOWN WAS APPLIED AND AN EMERGENCY WAS DECLARED.  LANDED WITHOUT INCIDENT.  ACFT REMOVED FROM SERVICE.  DURING TROUBLESHOOTING, FOUND RT AFT OVERWING COUPLING O-RING BLOWN,  REMOVED AND REPLACED BOTH O-RINGS IAW AMM 36-11-10.  PERFORMED LEAK TEST AND OPS CHECKED GOOD.  NO EICAS MESSAGES PRESENT AT THIS TIME. FOUND THERMAL SWITCH IN RT PYLON HAD TWO BROKEN WIRES.  R & R THERMAL SWITCH IN RT PYLON IAW AMM 36-20-02, PERFORMED TEST OF SWITCH IAW AMM 36-20-02, TASK 36-20-02-700-801-A.  TEST CHECKED GOOD.  ACFT RETURNED TO SERVICE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
