# SDR SIMA20170205001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 5, 2017
- Submitted: February 6, 2017
- Operation: Air carrier
- Aircraft: [N655AE](https://openairdocs.org/aircraft/N655AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 145452
- Aircraft time: 38,451 hours, 34,043 cycles
- System (JASC): [3620 · Pneumatic Indicating System](https://openairdocs.org/jasc/3620)
- Part: Clamp
- Condition: Loose
- Location: Bleed Valve
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA20170205001

## Discrepancy

PASSING THROUGH 10,000 FT, BLEED 2 LEAK.  FOUND A LEAK AT THE NR 2 ENG BLEED VALVE CLAMPS.   REINSTALLED CLAMP IAW AMM 36-11-05.  OPS CHECKED GOOD, LEAK CHECKED GOOD IAW 36-00-0-700-803.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
