# SDR SIMA201810087002

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 7, 2018
- Submitted: October 8, 2018
- Operation: Air carrier
- Aircraft: [N684JW](https://openairdocs.org/aircraft/N684JW), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 14500835
- Aircraft time: 34,683 hours, 30,298 cycles
- System (JASC): [2160 · Cabin Temperature Control System](https://openairdocs.org/jasc/2160)
- Part: Duct
- Condition: Leaking
- Location: Ac Bay
- Stage of operation: CL
- How discovered: O
- Nature of condition: O
- Precautionary procedure: D
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA201810087002

## Discrepancy

BLD 1 LEAK DURING CLIMBOUT, EPC C/W. -C/A-PERFORMED REMOVED AND REPLACED OF DUAL TEMP CONTROL VALVE Y-DUCT IAW AMM 21-60-01. LEAK CHECK GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
