# SDR SIMA201811063003

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 3, 2018
- Submitted: November 6, 2018
- Operation: Air carrier
- Aircraft: [N680AE](https://openairdocs.org/aircraft/N680AE), registered now
- Make and model: Emb EMB-145LR
- Registry model: [EMB EMB-145LR](https://openairdocs.org/model/embraer-emb-145lr) (OpenAirDocs)
- Aircraft serial: 14500820
- Aircraft time: 35,575 hours, 31,198 cycles
- System (JASC): [3297 · Landing Gear System Wiring](https://openairdocs.org/jasc/3297)
- Part: Wire Harness
- Condition: Malfunctioned
- Stage of operation: TO
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA201811063003

## Discrepancy

ON TAKEOFF ROLL CAUTION MSG'S IC 1 WOW INOP, SPOILER FAIL, SPS ADVANCED, LG AIR/GND FAIL CAUTION AND FLT IDLE 1 STOP FAIL ADVISORY ON EICAS. PERFORMED HIGH SPEED ABORT @ APROX 110 KTS "TRANSFERRED TO NRWC 680-MIA-03210"-C/A REMOVED AND REPLACED LGEU  IAW AMM 32-32-01 AND WOW AIR/GRD HARNESS IAW AMM 32-00-03-800-801A. PERFORMED OPS CHECK IAW AMM 32-32-01. OPS CHECK OK.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
