# SDR SIMA20220706001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: July 6, 2022
- Submitted: July 7, 2022
- Operation: Air carrier
- Aircraft: [N923AE](https://openairdocs.org/aircraft/N923AE), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 14500907
- Aircraft time: 40,756 hours, 35,858 cycles
- System (JASC): [2750 · Trailing Edge Flap Control System](https://openairdocs.org/jasc/2750)
- Part: Flag
- Condition: Failed
- Location: Lh Rh
- Stage of operation: TO
- How discovered: V
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA20220706001

## Discrepancy

FLAP FAIL AFTER TAKEOFF FLAPS STUCK AT 9 COMPLIED WITH QRH-C/A-TS PER FIM 27-51-00 FOUND TO BE TRANSITORY CONDITION. PERFORMED OPS CHECK THROUGH 3 FAULT FREE CYCLES REF. AMM 27-50-00. OPS CHECK GOOD AC GOOD FOR SERVICE

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
