# SDR SIMA20250121001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 21, 2025
- Submitted: January 22, 2025
- Operation: Air carrier
- Aircraft: [N771JV](https://openairdocs.org/aircraft/N771JV), registered now
- Make and model: Emb ERJ 170-100 LR
- Registry model: [EMB ERJ 170-100 LR](https://openairdocs.org/model/embraer-erj-170-100-lr) (OpenAirDocs)
- Aircraft serial: 17000087
- Aircraft time: 26,064 hours, 32,078 cycles
- System (JASC): [5610 · Flight Compartment Windows](https://openairdocs.org/jasc/5610)
- Part: Windshield
- Part number: PAS1873027
- Condition: Cracked
- Location: Zone 200
- Stage of operation: NR
- How discovered: V
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA20250121001

## Discrepancy

CAPT REPORTED WINDSHIED CRACKED EMERGENCY DECLARED. TDMI 771T5628 CAPTS WINDSHIELD ALREADY DEFERED NO FTHER DEFECTS NOTED IAW AMM CH 56-11-00. C/A PERFORMED RAR OF CAPTAINS DV WINDOW TRANSPARENCY IAW AMM 56-12-00. NO FURTHER DEFECTS NOTED REFER TO NRWC 771-CMH-01825. FOR OPS CHECK

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
