# SDR SIMA20250325001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 25, 2025
- Submitted: March 26, 2025
- Operation: Air carrier
- Aircraft: [N266NN](https://openairdocs.org/aircraft/N266NN), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000770
- Aircraft time: 15,977 hours, 10,717 cycles
- System (JASC): [3000 · Ice/Rain Protection System](https://openairdocs.org/jasc/3000)
- Part: Detector
- Part number: 0871LD2
- Part serial: 4642
- Condition: Failed
- Location: Nr 2 Ice
- Part time: 21,854 hours, 14,656 cycles
- Component: Ice Detector
- Component part number: 0871LD2
- Stage of operation: NR
- How discovered: O
- Nature of condition: B, J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA20250325001

## Discrepancy

ICE DETECTOR 2 FAIL. STARTED SMOKING, SMELL OF ELECTRICAL BURNING. "TRANSFERRED TO NRWC 066-DFW-03696" REF NRWC 066-DFW-03696. RAR ICE DETECTOR 2 IAW AMM 30-81-01. OPS TEST GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
