# SDR SIMA20250623001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 23, 2025
- Submitted: June 24, 2025
- Operation: Air carrier
- Aircraft: [N233NN](https://openairdocs.org/aircraft/N233NN), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000561
- Aircraft time: 22,911 hours, 15,395 cycles
- Engine: Ge CF348E5
- System (JASC): [7532 · Compressor Bleed Valve](https://openairdocs.org/jasc/7532)
- Part: Bleed Valve
- Part number: 10012463
- Condition: Failed
- Location: Zone 400
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SIMA20250623001

## Discrepancy

BLEED 2 OVERPRESSURE DURING CLIMB OUT. QRH DID NOT FIX IT. DIVERTED BACK TO DFW. DID NOT LAND OVERWEIGHT. EMERGENCY DECLARED. DEFERRED BLEED #2 NAPRSOV PER MEL 36-13 MAINTENANCE ACTION C/W AUTH:061272DM-C. RAR ENGINE #2 NAPRSOV AND PERFORMED LEAK TEST IAW: AMM 36-11-03 OPC AND LEAK CHECK GOOD MEL 36-13 IS NOW RESTORED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
