# SDR SWAA2021061771003

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 10, 2021
- Submitted: June 17, 2021
- Operation: Air carrier
- Aircraft: N416WN
- Make and model: Boeing 737-7H4
- Registry model: [Boeing 737-7H4](https://openairdocs.org/model/boeing-737-7h4) (OpenAirDocs)
- Aircraft serial: 32453
- Aircraft time: 65,393 hours, 38,534 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Gusset
- Condition: Cracked
- Location: Bs 500d S21r
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2021061771003

## Discrepancy

FWD CARGO AT FRAME STA 500D GUSSET AT STRINGERS 21R CRACK. 8-15 ; CORRECTED STR #. FWD CARGO AT FRAME STA 500D GUSSET AT STRINGERS 19R CRACK. 8-15 / CERTIFYING VOIDED WORK CAPTURED IN REFERENCE TO STEP 5 AND 6 THAT WAS ENTERED IN ERROR REGARDING HEAT TREATMENT.;CERTIFYING STEP 5 FOR COMPLETION OF HEAT TREATMENT.;CORRECTING LOCATION ON STEP NO1. REMOVED DAMAGED GUSSET AT FWD CARGO R/H SIDE STA 500D S-19R REF B737-700 SRM 51-40-02-0G-0.;FABRICATED GUSSET MAT USED 7075-0 .040 CLAD PO#1653447 PER REF DWG#143A9483.;HEAT TREATED GUSSET TO 7075-T62 AT AAR PO#1653447;HEAT TREATED NEW GUSSET P/N #143A9483-10 FROM 7075-O TO 7075-T62 IN REFERENCE BAC5602 AND AAR FORM OP 84; REV: 7.;INSTALLED NEW GUSSET AT FWD CARGO COMP AT FRAME STA 500D AT STRINGER 19R IN IAW 51-40-02-0G-0 AND DWG # 143A7902;LOCATED AND DRILLED NEW GUSSET AT FRAME STA 500D AT STRINGER 19R IN IAW 51-40-05-0G-0;OK TO INSTALL GUSSET;REMOVED AND INSTALLED NEW GUSSET AT FWD CARGO COMP AT FRAME STA 500D AT STRINGER 19RIN IAW 51-40-02-0G-0 AND DWG# 143A7902;REMOVED DAMAGED GUSSET AT FWD CARGO R/H SIDE STA 500D S-21R REF B737-700 SRM 51-40-02-0G-0.;TREATED WITH ALODINE AND PRIME NEW PART IN IAW SRM 51-20-01-0G-0;VERIFIED;VERIFIED STEP 11.;VERIFIED OP 84 HEAT TREAT FORM.;VERIFIED DAMAGE GUSSET STEP #1.;VERIFIED STEP #3 FABRICATION.;WORK CAPTURE IN REFERENCE TO STEP 5 ENTERED IN ERROR REGARDING HEAT TREATMENT.;VERIFIED HOLES OK; OK TO ALODINE AND PRIME NEW PART

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
