# SDR SWAA2021083109722

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 20, 2021
- Submitted: August 31, 2021
- Operation: Air carrier
- Aircraft: [N965WN](https://openairdocs.org/aircraft/N965WN), registered now
- Make and model: Boeing 737-7H4
- Registry model: [Boeing 737-7H4](https://openairdocs.org/model/boeing-737-7h4) (OpenAirDocs)
- Aircraft serial: 36677
- Aircraft time: 32,936 hours, 20,041 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Gusset
- Condition: Cracked
- Location: Bs 500d S19d
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2021083109722

## Discrepancy

FCB GUSSET CRACKED BS 500D STR 19L WL 188 ; / [01] REMOVED GUSSET BS 500D STR-19L WL 188. IAW. SRM 51-40-02.; [02] LOCATED AND DRILLED FCB GUSSET AT B.S 500D STR 19L PER SRM51-40-05-0G-0;DWG 143A7902. O.K TO INSTALL.; [03] OKAY TO INSTALL FCB GUSSET; [04] INSTALLED FCB GUSSET AT B.S 500D STR 19L PER SRM51-40-02-0G-0;DWG 143A7902.; [05] VERIFIED INSTALLATION OF FCB GUSSET AT BS 500D STR 19L PER SRM 51-40-02-0G-0;DWG 143A7902.; [06] ADDED N/A TO BLOCK 4 OF MEASUREMENT'S FIELD AND CHECKED BLOCK 6 AS PRIMARY STRUCTURE.; [07] VERFIED; [08] INSPECTION OF INSTALLATION HAS BEEN ACCOMPLISHED. <BR><BR>NO FURTHER ACTIONS REQUIRED.; [09] FCB GUSSET AT BS500D; S-19L; WL188 HAS BEEN REPLACED.<BR><BR>NO FURTHER ACTIONS REQUIRED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
