# SDR SWAA2021092706129

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 11, 2021
- Submitted: September 27, 2021
- Operation: Air carrier
- Aircraft: [N208WN](https://openairdocs.org/aircraft/N208WN), registered now
- Make and model: Boeing 737-7H4
- Registry model: [Boeing 737-7H4](https://openairdocs.org/model/boeing-737-7h4) (OpenAirDocs)
- Aircraft serial: 29856
- Aircraft time: 52,294 hours, 30,932 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Floor Support
- Condition: Cracked
- Location: Fuselage
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2021092706129

## Discrepancy

CRACKED FLOOR SUPPORT AT B.S. 540; B.L. 0 - R.B.L. 24.5; W.L. 208.1. ; / [01] REMOVED FLOOR SUPPORT AT BS 540 BL 0 RBL 24.5 WL 208.1 IAW SRM 51-40-01-0G-0 ITEM D; [02] RECIVED NEW FLOOR SUPPORT P/N 143A-5240-36 LOCATED AND DRILLED NEW FLOOR SUPPORT AT BS 540BL 0 RBL 24.5 WL 208.1 IAW SRM 51-10-01-0G-0 AND OK TO INSTALL; [03] VERIFIED CORRECTIVE ACTION 2 OK TO INSTALL; [04] INSTALLED FLOOR SUPPORT AT BS 540 BL 0 RBL24.5 WL 208.1 IAW SRM 51-40-01-0G ITEM D. DWD 143A0060; [05] UPDATED PARTS REQUIREMENTS.; [06] VERIFIED CORRECTIVE ACTION 4; [07] ALL ITEM ARE COMPLETED; [08] VERIFIED JOB COMPLETE

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
