# SDR SWAA2021111527030

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 5, 2021
- Submitted: November 15, 2021
- Operation: Air carrier
- Aircraft: N788SA
- Make and model: Boeing 737*
- Aircraft serial: 30603
- Aircraft time: 68,361 hours, 40,407 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Support
- Condition: Corroded
- Location: Fuselage
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2021111527030

## Discrepancy

CORROSION ON FLOOR TO SIDEWALL SUPPORT AT AFT CARGO BAY BS727B - BS767 RBL21 WL156. ; / [01] REMOVED CORROSION ON FLOOR TO SIDEWALL SUPPORT AT ACB P/N 146A7502-2 AREA 100' X 1' X .008' IAW SRM 51-10-02-0G-0. FOUND TO BE OUT OF LIMITS DUE TO ORIGINAL MAT. THICKNESS .040' AND REMAINNING THICKNESS .032' IAW SRM 53-00-53-1A-2 STEP 4.A.(2).<BR><BR>IT WILL BE REPAIRABLE BY REPLACEMENT IAW SRM 51-10-02-0G-0 STEP. 9.C.<BR><BR>TOOL USED ID: IS000686 ; S/N: 67171914<BR> DATE: 03/2021 ; DUE:03/2022; [02] REMOVED FLOOR TO SIDEWALL SUPPORT AT ACB P/N 146A7502-2 FROM BS 727 + 4' TO BS 787; RBL 21; WL 156 IAW SRM 51-10-02-0G-0; [03] VERIFIED CORRECTIVE ACTION STEPS 1 AND 2; [04] RECIVED NEW FLOOR TO SIDEWALL SUPPORT ITEM 146A8127U1 LOT 1471800-1 LOCATED AND DRILLED NEW FLOOR TO SIDEWALL AT BS 727-767 RBL21 WL 156; SRM 51-40-05-OG-0 DWG 146A7500.-; [11] VERIFIED INSTALLED NEW FLOOR TO SIDEWALL SUPPORT AT AFT CARGO BAY BS 727-767 RBL 21 WL 156;IAW SRM 51-40-02;DWG 146A7500 REV:C AND DWG 146A7502 REV:A.; [12] VERIFIED ALL STEPS COMPLETE.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
