# SDR SWAA2022012051185

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 7, 2021
- Submitted: January 20, 2022
- Operation: Air carrier
- Aircraft: [N422WN](https://openairdocs.org/aircraft/N422WN), registered now
- Make and model: Boeing 737-7H4
- Registry model: [Boeing 737-7H4](https://openairdocs.org/model/boeing-737-7h4) (OpenAirDocs)
- Aircraft serial: 29826
- Aircraft time: 66,890 hours, 39,356 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Bear Strap
- Condition: Cracked
- Location: Fuselage
- Stage of operation: UK
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2022012051185

## Discrepancy

CRACK INDICATION FOUND AROUND FASTENER LOCATED BEAR STRAP AT LEVEL FITTING-LATCH; STA 294.5 BETWEEN S-8R AND S-9R. LENGTH CRACK IS 1.5 INCH. ; 2021-557928 / [01] ET TOOL USED PN: NORTEC 600D; SN: 21013803; DUE DATE: 05-MAR-22; [02] LATE ENTRY REMOVED FASTENER ON REPAIR AREA BETWEEN BS 277 TO BS 312 AND STR 7R TO STR 10R IAW B737-700 SRM 51-40-02.; [03] LATE ENTRY REMOVED FASTENER ON REPAIR AREA BETWEEN BS 277 TO BS 312 AND STR 7R TO STR 10R IAW B737-700 SRM 51-40-02.; [04] TOOL USED: EDDY CURRENT EQUIPMENT P/N: NORTEC 600D; S/N: 210138003; DUE DATE: 05-MAR-22.; [05] TOOL USED: PRECISION BALANCE; P/N: PPC-200W; S/N: 35715; DUE DATE: 26-AUG-22.; [06] PERFORMED REPAIR ON EXTERNAL SKIN LOC BTW BS 277 TO BS 320 AND

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
