# SDR SWAA2022021664928

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 28, 2022
- Submitted: April 4, 2022
- Operation: Air carrier
- Aircraft: N7730A
- Make and model: Boeing 737
- Aircraft serial: 33926
- Aircraft time: 51,354 hours, 27,779 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Angle
- Condition: Corroded
- Location: Aft Cargo
- Stage of operation: UK
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2022021664928

## Discrepancy

AFT CARGO BAY; CORROSION ON SUPPORT ANGLE LWR SURFACE; BS 850; RBL 20; WL 160 / [01] EVALUATED CORROSION ON ANGLE BS 847+3 RBL 20 WL 160; FOUND TO BE OUT OF LIMITS PER SRM DUE TO NO LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0;[02] VERIFIED CORRECTIVE ACTION #1;[03] REMOVED SUPPORT ANGLE PER SRM 51-40-02-0G-0;[04] RECEIVED FORMED ANGLE; FROM OSS OUT FOR HEAT TREAT. PO# 854508-SWA.;[05] LOCATED AND DRILLED FORMED SUPPORT ANGLE; BS850; RBL20; WL160; AND APPLIED CHEMICAL CONVERSION COATING; ALL IAW SRM 51-40-05-0G-0; SRM 51-20-01-0G-0; DWG 146A8123-14. AND OK TO PRIME.;[06] VERIFIED CORRECTIVE ACTIONS 4; 5. <BR><BR>OK TO PRIME PART.;[07] REQUESTING OK TO INSTALL NEW ANGLE; BS 850; RBL 20.;[08] VERIFIED CORRECTIVE ACTION 7. OK TO INSTALL;[09] INSTALLED NEW SUPPORT ANGLE BS850 RBL 20; WL 160; IAW SRM 51-40-02-0G-0; DWG 146A8123-14;[10] VERIFIED CORRECTIVE ACTION 1.;[11] ALL WORK ACCOMPLISHED. PART REPLACED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
