# SDR SWAA2022040784591

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: March 16, 2022
- Submitted: April 7, 2022
- Operation: Air carrier
- Aircraft: [N240WN](https://openairdocs.org/aircraft/N240WN), registered now
- Make and model: Boeing 737-7H4
- Registry model: [Boeing 737-7H4](https://openairdocs.org/model/boeing-737-7h4) (OpenAirDocs)
- Aircraft serial: 32503
- Aircraft time: 53,442 hours, 31,881 cycles
- System (JASC): [5312 · Fuselage Main, Bulkhead](https://openairdocs.org/jasc/5312)
- Part: Doubler
- Condition: Cracked
- Location: Bulkhead
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2022040784591

## Discrepancy

RIGHT WHEEL WELL FWD BULKHEAD WEB BY EXHAUST BETWEEN RBL 15' AND RBL 25' I/B HOLE CRACKED / [01] FABRICATED NEW RIGHT WHEEL WELL FWD BULKHEAD DOUBLER BY EXHAUST BETWEEN RBL 15 - RBL 25. IRW B737-700 SRM 51-30-01-0G-0 AND DWG # 111A1511;[02] LOCATED AND DRILLED NEW HOLES ON DOUBLER IRW B737-700 SRM 51-40-05-0G-0;[03] ADD ON STEP 1: MATERIAL USED 2024-0.040'' CLAD. PO# 1732885. PENDING HEAT TREAT.;[04] PERFORMED FPI ON JOGGLED WEB PRIOR HEAT TREATMENT. IAW BAC 5423 & BSS7039. NO CRACKS FOUND.;[05] PERFORMED FPI ON FABRICATED ANGLE PRIOR HEAT TREATMENT. IAW BAC 5423 & BSS7039. NO CRACKS FOUND.;[06] VERIFIED STEPS 1-3;[07] PERFORMED HEAT TREATMENT TO FABRICATED DOUBLER AS PER BAC 5602; ATTACHED AAR FORM OP 84; CONTROL TAG #400369.;[08] VERIFIED STEP 7. OK TO TREAT AND PRIME;[09] TREATED & PRIMED NEW DOUBLER AS PER B737-7 SRM 51-20-01-0G-0 & AMM 51-21-72-370-804.;[10] NEW DOUBLER WILL BE INSTALLED ON CARD:TTG8Q00B8QLC.;[11] VERIFIED STEPS 9 AND 10;[12] VERIFIED STEPS 9 AND 10

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
