# SDR SWAA2022042794169

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 13, 2022
- Submitted: April 27, 2022
- Operation: Air carrier
- Aircraft: [N8684F](https://openairdocs.org/aircraft/N8684F), registered now
- Make and model: Boeing 737-8H4
- Registry model: [Boeing 737-8H4](https://openairdocs.org/model/boeing-737-8h4) (OpenAirDocs)
- Aircraft serial: 36653
- Aircraft time: 20,246 hours, 9,455 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Angle
- Condition: Corroded
- Location: Fwd Fuselage
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2022042794169

## Discrepancy

DOT A-24-003 WIFI ADAPTER RING FORWARD BONDING STRAP ATTACH ANGLE CORRODED. / [01] EVALUATED ATTACH ANGLE FOUND 100% MATERIAL LOSE<BR>OUT OF LIMITS I.A.W SRM 51-10-02-0G-0;[02] REMOVED ATTACH ANGLE I.A.W SRM 51-40-02-0G-0;[03] VERIFIED MATERIAL FOR FABRICATION OF BRACKET AS 2024-0 .040<BR>I.A.W SAINT=GOBAIN DWG 5214-002 ANS SRM-5214-010<BR>A TAG #A11365;[04] VERIFIED STEPS 1 - 3; VERIFIED MATERIAL FOR FABRICATION OF BRACKET AS 2024-0 .040;[05] FABRICATED NEW BRACKET I.A.W SAAINT GOBAIN DWG 5214-010;[06] VERIFIED STEP 5;[07] OK GIVEN TO TREAT AND PRIME;[08] TREATED AND PRIMED BRACKET I.A.W MM 51-21-72-370-801;[09] VERIFIED ITEM 8<BR>OK TO INSTALL ATTACH ANGLE;[10] INSTALLED BRACKET AND EDGE SEALED BRACKET I.A.W SIAINT-GOBAIN SRM 5214-010;[11] VERIFIED STEP 10;[12] PERFORMED BONDING CHECK I/A/W SAINT-GOBAIN SRM 5214-010. CHECK GOOD<BR><BR>AAR TOOLS: 42387 DD:07/20/22;[13] VERIFIED STEPS 12.<BR>AUDIT C/W

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
