# SDR SWAA2022062712808

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 28, 2022
- Submitted: June 27, 2022
- Operation: Air carrier
- Aircraft: N8634A
- Make and model: Boeing 737-8H4
- Registry model: [Boeing 737-8H4](https://openairdocs.org/model/boeing-737-8h4) (OpenAirDocs)
- Aircraft serial: 42522
- Aircraft time: 27,272 hours, 12,503 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Angle
- Condition: Corroded
- Location: Fwd Cargo
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2022062712808

## Discrepancy

FWD CARGO COMPARTMENT L/H TRANSITION ANGLE HAS CORROSION AT FASTENER HOLE STA. 500B + 16' LBL 25 / [01] BLENDED OUT CORROSION AT FWD CARGO L/H TRANSITION ANGLE STA 500B+16? PER SRM 51-10-02. MEASURED AND FOUND OUT OF LIMITS PER SRM 53-00-53-1A-2 FIG.103; DETAIL D.;[02] REMOVED A SECTION FROM STA. 500A+10 TO STA. 500F +9 FOR REPAIR PER SRM 53-00-53-2R-5 .;[03] LOCATED; DRILLED ;TREATED AND PRIMED THE REPAIR PARTS PER SRM 53-00-53;AND SRM 51-20-01.;[04] VERIFIED LOCATED; DRILLED ;TREATED AND PRIMED THE REPAIR PARTS FOR CORRECTIVE ACTION #3.;[05] OK TO INSTALL NEW FABRICATED L/H TRANSITION ANGLE SECTION FROM STA. 500A+10 TO STA. 500F +9;[06] REPAIRED PER EA-22-153-01673 AND SRM 53-00-53-2R-5.;[07] C/W INSPECTION OF TRANSITION ANGLE INSTALL;[08] C/W INSPECTION OF TRANSITION ANGLE INSTALL;[09] REPAIRED PER EA-22-153-01642 AND SRM 53-00-53-2R-5.;[10] LINE #6 SIGNED OFF WITH INCORRECT EA.;[11] NOTED CORRECTION OF EA REF. ON STEP #6. THE CORRECT REF. IS REPAIRED PER EA-22-153-01642 AND SRM 53-00-53-2R-5.;[12] REPAIRED FWD CARGO LH TRANSITION STA 500B + 16'; LBL 25 PER<BR>EA 22-153-01642 AND SRM 53-00-53-2R-5.;[13] ANGLE WAS REPAIRED FWD CARGO LH TRANSITION STA 500B + 16'; LBL 25 PER<BR>EA 22-153-01642 AND SRM 53-00-53-2R-5. SEE CORRECTIVE ACTIONS AND STEPS FOR ALL WORK PERFORMED.;[14] (RII)ANGLE WAS REPAIRED FWD CARGO LH TRANSITION STA 500B + 16'; LBL 25 PER<BR>EA 22-153-01642 AND SRM 53-00-53-2R-5. SEE CORRECTIVE ACTIONS AND STEPS FOR ALL WORK PERFORMED.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.