# SDR SWAA2022083040348

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 9, 2022
- Submitted: August 30, 2022
- Operation: Air carrier
- Aircraft: [N8647A](https://openairdocs.org/aircraft/N8647A), registered now
- Make and model: Boeing 737-8H4
- Registry model: [Boeing 737-8H4](https://openairdocs.org/model/boeing-737-8h4) (OpenAirDocs)
- Aircraft serial: 42528
- Aircraft time: 27,244 hours, 12,560 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Post
- Condition: Corroded
- Location: Aft Fuselage
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2022083040348

## Discrepancy

LAVATORY D. UPON INSPECTION FOUND VISUAL EVIDENCE OF CORROSION ON BOTTOM OF AFT DOOR POST . / [01] REMOVED HEADER AND AFT DOOR POST FROM LAVATORY D TO BE REPAIRED PER CMM25-48-25;[02] REMOVED 6'FROM THE BOTTOM OF LAV D DOOR POST AS INSTRUCTED IN YOKOHAMA CMM 25-48-25 G STEP (3);[03] VERIFIED 1 AND 2;COMPLETE;[04] FABRICATED NEW REPAIR PEICE FROM 6061-T6 BY OUTSIDE VENDOR CERTIFICATE OF CONFORMANCE TRACKING NUMBER W35763;[05] FABRICATED NEW REPAIR PEICE FROM 6061-T6 BY OUTSIDE VENDOR CERTIFICATE OF CONFORMANCE TRACKING NUMBER W35763 ; REF CMM 25-48-25 FIG 604;[06] VERIFIED 4 AND 5;OK TO TREAT/PRIME REPAIR PART.;[07] TREATED AND PRIMED NEW REPAIR PART IRW AMM 51-21-41-3740-803;51-21-72-370-803;[08] VERIFIED 7;COMPLETE;[09] OK TO INSTALL REPAIR PART;[10] INSTALLED REPAIR PART AT LAV D ON BOTTOM OF AFT DOOR POST IAW CMM 25-48-25;[11] VERIFIED 10;COMPLETE

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
