# SDR SWAA2022120669747

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: November 10, 2022
- Submitted: December 6, 2022
- Operation: Air carrier
- Aircraft: [N7741C](https://openairdocs.org/aircraft/N7741C), registered now
- Make and model: Boeing 737-7BD
- Registry model: [Boeing 737-7BD](https://openairdocs.org/model/boeing-737-7bd) (OpenAirDocs)
- Aircraft serial: 35788
- Aircraft time: 51,579 hours, 26,914 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Floor Support
- Condition: Cracked
- Location: Bs 277-294 Rbl 1
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2022120669747

## Discrepancy

MAIN CABIN BS277 TO BS294.5 RBL 1 WL 208.1 INTERCOSTAL CRACKED AT 2 LOCATION / [01] REMOVED INTERCOSTAL CRACK AT MAIN CABIN BS. 277 TO BS. 294.5 RBL. 1. REF. SRM. 51-40-02-0G-0.;[02] VERIFIED; STEP # 1.;[03] RECEIVE; LOCATED AND DRILLE HOLES IN NEW INTERCOSTAL PN. 141A5410U3AAR . REF SRM. 51-40-02-0G-0.;[04] CORRECTION STEP #3: RECEIVED; LOCATED AND DRILLED HOLES IN NEW INTERCOSTAL PN. 141A5410U3AAR. REF; SRM. 51-40-02-05-0G-0.;[05] VERIFIED; STEP # 4. OK TO TREAT AND PRIME NEW HOLES;[06] TREATED WITH ALODINE & PRIMER NEW HOLES. REF. SRM. 51-20-01-0G-0.;[07] VERIFIED; STEP # 6. OK TO INSTALL NEW INTERCOSTAL;[08] INSTALLED NEW INTERCOSTAL PN. 141A5410U3AAR AT MAIN CABIN BS. 277 TO BS 294.5 RBL. 1; RED. SRM. 51-40-02-0G-0.;[09] COMPLETED TABLE.;[10] STEPS 4 AND 7 ARE VERIFIED AS RII;[11] VERIFIED 8

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
