# SDR SWAA2024082821998

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 2, 2024
- Submitted: August 28, 2024
- Operation: Air carrier
- Aircraft: [N8698B](https://openairdocs.org/aircraft/N8698B), registered now
- Make and model: Boeing 737-8H4
- Registry model: [Boeing 737-8H4](https://openairdocs.org/model/boeing-737-8h4) (OpenAirDocs)
- Aircraft serial: 36977
- Aircraft time: 26,776 hours, 13,241 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Floor Support
- Condition: Corroded
- Location: Zone 100
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2024082821998

## Discrepancy

CORROSION FOUND ON INTERCOSTAL BETWEEN STAS 947-967; RBL 50.<[01] REMOVED CORROSION PER SRM 51-10-02. DAMAGE REMOVAL FOUND TO BE OUT OF LIMITS PER SRM 53-70-51-1A-1.;[02] RII- C/W INSPECTION AS REQUIRED C/A #1. DAVID BELL (TECHNICIAN); 02-AUG-2024 22:26 UTC<BR>REMOVED CORROSION PER SRM 51-10-02. DAMAGE REMOVAL FOUND TO BE OUT OF LIMITS PER SRM 53-70-51-1A-1.;[03] REMOVED INTERCOSTAL BETWEEN STA?S 947-967; RBL 50 PER SRM 51-40-02;[04] RECIEVED NEW PART MATCH DRILLED PER SRM 51-40-02 AND INSTALLED CLICK BOND NUT PLATES PER SRM 51-40-10 AT TIME 1600 AND DATE AUGUST 08 2024.;[05] REQUIRES PULL TEST AND INSTALLATION.;[06] C/W INSP. RECIEVED NEW PART MATCH DRILLED PER SRM 51-40-02 AND INSTALLED CLICK BOND NUT PLATES PER SRM 51-40-10 AT TIME 1600 AND DATE AUGUST 08 2024.;[07] OK TO INSTALL NEW INTERCOSTAL BETWEEN STA. 947-967; RBL 50;[08] REMOVED AND REPLACED DAMAGED INTERCOSTAL PER SRM 51-40-05 AND SRM 51-40-02.;[09] RII INSPECTED AS REQUIRED. CORRECTIVE ACTION #8

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
