# SDR SWAA2024112550871

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: October 19, 2024
- Submitted: November 25, 2024
- Operation: Air carrier
- Aircraft: [N8509U](https://openairdocs.org/aircraft/N8509U), registered now
- Make and model: Boeing 737-8H4
- Registry model: [Boeing 737-8H4](https://openairdocs.org/model/boeing-737-8h4) (OpenAirDocs)
- Aircraft serial: 36925
- Aircraft time: 26,850 hours, 13,267 cycles
- System (JASC): [5315 · Fuselage Main, Floor Beam](https://openairdocs.org/jasc/5315)
- Part: Floorbeam
- Condition: Corroded
- Location: Zn 200 Fus Top
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2024112550871

## Discrepancy

.PASSENGER AREA STA 947;LBL16 FLOOR BEAM TOP CAP HAS CORROSION..<[01] CORROSION FOUND OUT OF LIMITS PER SRM 53-70-15-1A-1. REMOVED DAMAGED SECTION OF FLOOR BEAM TOP CAP PER SRM 53-70-51-2R-5;[02] FLAP PEENED THE CUT EDGES PER SRM 53-70-51-2R-5 LOCATED; DRILLED; DEBURED; TREATED AND PRIMED REPAIR PARTS; T-CHORD [1]; 2EA REPAIR ANGLES [2] AND 2EA REPAIR STRAPS [3]. ALL WORK DONE IAW SRM 53-70-51-2R-5.FABRICATED 3EA [4] FILLERS PER SRM 53-70-51-2R-5 AND TTG8Q00WV4YT<BR><BR>OK TO INSTALL.;[08] 7. TROY ROSSMAN (TECHNICIAN); 06-NOV-2024 16:25 UTC<BR>FABRICATED 3EA [4] FILLERS PER SRM 53-70-51-2R-5 AND TTG8Q00WV4YT TRIMMED FWD EDGE OF INTERCOSTAL AT STA. 947.5; LBL 24. FLAP PEENED TRIMMED EDGE; ALODINED AND PRIMED TRIMMED EDGE ALL IAW SRM 53-70-51-2R-5 REPAIR 5 INSTALLED FLOOR BEAM REPAIR SPLICE PER SRM 53-70-51-2R-5.;[12] 11. TROY ROSSMAN (TECHNICIAN); 08-NOV-2024 15:39 UTC<BR>INSTALLED FLOOR BEAM REPAIR SPLICE PER SRM 53-70-51-2R-5. RII;[13] INSTALLED REPAIR T- CAP PER SRM 53-70-51-2R-5.;[14] INSPECTED INSTALLATION OF REPAIR T- CAP PER SRM 53-70-51-2R-5. RII;[15] INSPECTED INSTALLED CABLE GUARD SUPPORT CLIP AT BS 947; LBL 3;[16] INSPECTED INSTALLED 2 ANGLE CLIPS AND SPACER TO COMPLETE INSTALLATION OF INTER COASTAL AT B/S 947-967 LBL-24.;[17] REPAIRED PER SRM 53-70-51-2R-5;[18] ALL INSP STEPS COMPLETE. SEE ABOVE CA FOR WORKED PERFORMED AND SIGNED FOR.;[19] ALL INSP RII STEPS COMPLETE. SEE ABOVE CA FOR WORKED PERFORMED AND SIGNED FOR

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
