# SDR SWAA2025010882027

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: December 31, 2024
- Submitted: January 8, 2025
- Operation: Air carrier
- Aircraft: [N8514F](https://openairdocs.org/aircraft/N8514F), registered now
- Make and model: Boeing 737-8H4
- Registry model: [Boeing 737-8H4](https://openairdocs.org/model/boeing-737-8h4) (OpenAirDocs)
- Aircraft serial: 36975
- Aircraft time: 26,358 hours, 13,054 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Gusset
- Condition: Cracked
- Location: Zone 100
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWAA2025010882027

## Discrepancy

FWD CARGO GUSSET CRACKED AT BS500I STR19R.<[01] REMOVED DAMAGED GUSSET AT BS 500I AND STR19R FOR REPLACEMENT PER SRM 51-40-02.;[02] LOCATED; DRILLED; AND DEBURRED NEW REPLACEMENT GUSSET PER SRM 51-40-05.;[03] INSPECTED AS REQUIRED. CORRECTIVE ACTION #1 AND #2. OK TO INSTALL NEW GUSSET.;[04] REMOVED AND REPLACED FWD CARGO CRACKED GUSSET PER SRM 51-40-02.;[05] INSPECTED AS REQUIRED. CORRECTIVE ACTION #4

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
