# SDR SWIA200211275

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 29, 2002
- Submitted: October 9, 2002
- Operation: Air carrier
- Aircraft: N905SW
- Make and model: Cndair CL6002B19
- Aircraft serial: 7437
- Aircraft time: 5,595 hours, 4,285 cycles
- System (JASC): [4950 · APU Bleed Air System](https://openairdocs.org/jasc/4950)
- Part: Control Valve
- Part number: 1098046
- Part serial: 383
- Condition: Malfunctioned
- Location: Apu
- Part time: 438 hours, 336 cycles
- Stage of operation: CL
- How discovered: O
- Nature of condition: J
- Precautionary procedure: A
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWIA200211275

## Discrepancy

APU LOAD CONTROL VALVE WOULD NOT CLOSE AFTER TAKEOFF.  RETURNED TO FAT.  REMOVED AND REPLACED APU LCV IAW CRJ MM 49-51-01.  OPERATIONAL CHECK GOOD AT THIS TIME.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
