# SDR SWIA200718223

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: May 5, 2007
- Submitted: May 15, 2007
- Operation: Air carrier
- Aircraft: N293SW
- Make and model: Emb EMB-120ER
- Registry model: [EMB EMB-120ER](https://openairdocs.org/model/embraer-emb-120er) (OpenAirDocs)
- Aircraft serial: 120320
- Aircraft time: 24,174 hours, 35,784 cycles
- System (JASC): [2420 · AC Generation System](https://openairdocs.org/jasc/2420)
- Part: Shunt
- Condition: Overheated
- Location: Apu Generator
- Stage of operation: TX
- How discovered: O
- Nature of condition: M, B
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWIA200718223

## Discrepancy

FIRST OFFICERS RELAY PANEL IS TOO HOT TO TOUCH, ALONG WITH A BURNING ODOR ON FLIGHT DECK.  FOUND APU GENERATOR SHUNT/RELAY TO BE OVERHEATING.  FOUND BOTH TERMINALS ON RELAY TO BE LOOSE.  SECURED TERMINALS.  OPS CHECK GOOD.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
