# SDR SWIA2014061638175

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 13, 2014
- Submitted: June 16, 2014
- Operation: Air carrier
- Aircraft: [N750SK](https://openairdocs.org/aircraft/N750SK), registered now
- Make and model: Cndair CL6002C10
- Aircraft serial: 10207
- Aircraft time: 28,166 hours, 16,748 cycles
- System (JASC): [2450 · AC Power Distribution System](https://openairdocs.org/jasc/2450)
- Part: Electrical Sys
- Condition: Malfunctioned
- Stage of operation: CR
- How discovered: O
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWIA2014061638175

## Discrepancy

NR 1 IDG OFFLINE ENROUTE,  AC BUSS 1.  AC ESS BUSS DID NOT TRANSFER TO IDG 2 AND AC ESS TRANSFER SWITCH WOULD NOT SWITCH POWER TO AC BUSS 2.  POWER RETURNED TO ALL BUSES AFTER STARTING APU BUT ELECTRICAL SYNOPTIC PAGE STILL SHOWED BUSSES NOT POWERED AND NO ASSOCIATED FLOW LINES.  RESET NR 1 GENERATOR, ALL INDICATIONS BECAME NORMAL ON GROUND.  PERFORMED VISUAL INSPECTION OF NR 1 AND NR 2 IDG OIL SYSTEMS AND INSPECTED APU OIL LEVEL AND FOUND TO BE WITHIN LIMITS IAW AMM.  PERFORMED OPS TEST OF THE AC AUTOMATIC POWER TRANSFER CIRCUITS, OPS CHECK GOOD IAW AMM.

---