# SDR SWIA202266588

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: September 23, 2022
- Submitted: October 5, 2022
- Operation: Air carrier
- Aircraft: [N171SY](https://openairdocs.org/aircraft/N171SY), registered now
- Make and model: Emb EMB110*
- Aircraft serial: 17000485
- Aircraft time: 21,583 hours, 11,942 cycles
- System (JASC): [5311 · Fuselage Main, Frame](https://openairdocs.org/jasc/5311)
- Part: None
- Condition: Corroded
- Stage of operation: IN
- How discovered: O
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWIA202266588

## Discrepancy

AFT WET AREA R/H LONGITUDINAL BEAM HAS CORROSION ON THE TOP SURFACE AT FR. 88.     (C-CHECK RO 10/4/2022)     / REMOVED AND REPLACED AFT WET AREA R/H LONGITUDINAL BEAM AT FR 88 REF SRM 51-40-08. APPLIED SURFACE PROTECTION REF SRM 51-23-06. NO CHANGE TO WEIGHT AND BALANCE

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
