# SDR SWIA2025021328

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: January 28, 2025
- Submitted: February 13, 2025
- Operation: Air carrier
- Aircraft: [N243SY](https://openairdocs.org/aircraft/N243SY), registered now
- Make and model: Emb ERJ 170-200 LR
- Registry model: [EMB ERJ 170-200 LR](https://openairdocs.org/model/embraer-s-a-erj-170-200-lr) (OpenAirDocs)
- Aircraft serial: 17000592
- Aircraft time: 20,256 hours, 14,854 cycles
- System (JASC): [5322 · Fuselage Internal Mounting Structure](https://openairdocs.org/jasc/5322)
- Part: Shear Tie
- Condition: Corroded
- Location: Zone 100
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWIA2025021328

## Discrepancy

CENTER FUSELAGE III SHEAR CLIP AT FRAME 88 STRINGER 27R-28R HAS CORROSION     (C-CHECK RO 2/11/2025)    REMOVED AND REPLACED CENTER FUSELAGE III SHEAR CLIP AT FR 88 STRG 27R-28R REF EMB 175 SRM 51-40-08.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
