# SDR SWIA2026041676203

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 16, 2026
- Submitted: June 9, 2026
- Operation: Air carrier
- Aircraft: [N973SW](https://openairdocs.org/aircraft/N973SW), registered now
- Make and model: Cndair CL6002B19
- Aircraft serial: 7949
- Aircraft time: 48,839 hours, 42,470 cycles
- System (JASC): [5315 · Fuselage Main, Floor Beam](https://openairdocs.org/jasc/5315)
- Part: Floorbeam
- Condition: Corroded
- Location: Zone 200
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/SWIA2026041676203

## Discrepancy

CORRODED NUTPLATE ON FLOOR BOARD LANDING JUST AFT OF FS 559.00+80 ON RBL 9.  REMOVED AND REPLACED UPPER FLOOR BEAM (FLOORBOARD LANDING/SEAT TRACK MOUNT), SPLICE CHANNELS, SUPPORTS & REMOVED AND REINSTALLED 4 INTEGRATED CROSSBEAM WEBS, INTERCOSTAL CLIPS/BRACKETS BETWEEN FS559.00+64 TO FS 574.00 AT RBL 9.00 IN REFERENCE TO SRM 51-42-06, 51-42-21, 53-00-43 AND REO 601R-53-00-027, REV. D, DATED 26-NOV-2009 AND REO 601R-53-51-741, REV.--, DATED 2026-05-28. ALL NDT'S COMPLIED WITH NO DEFECTS FOUND AT THIS TIME. COMPLETED TASK CARD 51-900-1003-SKY. REF. CP 32194801 FOR THE CROSSBEAM FREEZE PLUG INSTALLATION. REFERENCE CHILD CP 32270652 FOR EDDY CURRENT.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
