# SDR TRAX200800552

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 16, 2008
- Submitted: April 21, 2008
- Operation: Air carrier
- Aircraft: [N825AS](https://openairdocs.org/aircraft/N825AS), registered now
- Make and model: Cndair CL6002B19
- Aircraft serial: 7207
- Aircraft time: 24,781 hours, 21,854 cycles
- System (JASC): [5320 · Fuselage Miscellaneous Structure](https://openairdocs.org/jasc/5320)
- Part: Angle
- Condition: Cracked
- Location: Fuselage
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/TRAX200800552

## Discrepancy

FS 280 FRAME UPPER AFT ANGLE CRACKED AT RBL 12.0.  JOB COMPLETE.  STARTED REMOVING FS 280 UPPER ANGLE AT RBL 12.0 PER CRJ 200 SRM 51-42-20.  REPAIRED J-ANGLE ON THE PILOT`S BULKHEAD AT FS 280.0 RT BL 9.0 IAW EO 600-53-0091.  PERFORMED ET INSPECTION OF CUT LINES AT FS 280 IAW REO 601R-53-11-136 PER CRJ 200 NDTM 51-20-06.  NO DEFECTS NOTED.  4/18/08.  FABRICATED -3 AND -4 SPLICE ANGLES OUT OF 7075 -0 .050" BATCH 511928, PO 20040439.  HEAT TREATED -3 & -4 SPLICE ANGLES TO +62 CONDITION AS PER CRJ 200 SRM 51-24-06 IAW REO 601R-53-11-136.  HARDNESS TEST GOOD.  FINAL TRIMMED, DRILLED, AND FINISHED -3, -4, AND -1 REPAIR PARTS IAW REO 601R-53-11-136.  OK TO INSTALL.  INSTALLED ALL 280 REPAIR PARTS INCLUDING RBL 9 INBOARD AND OUTBOARD CLIPS.  FINISHED SURFACE AND APPLIED CIC.  REINSTALLED DRIP TRAY.  WORK DONE IAW REO 601R-53-11-136.  JOB COMPLETE.  SUPPLEMENTAL SDR CLOSED 4/21/08.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.