# SDR TRBACPCP2010023

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 17, 2010
- Submitted: April 27, 2010
- Operation: Air carrier
- Aircraft: [N499AT](https://openairdocs.org/aircraft/N499AT), registered now
- Make and model: Aerosp ATR 72-212A
- Registry model: [Aerosp ATR 72-212A](https://openairdocs.org/model/aerospatiale-atr-72-212a) (OpenAirDocs)
- Aircraft serial: 499
- Aircraft time: 20,931 hours, 24,578 cycles
- System (JASC): [5312 · Fuselage Main, Bulkhead](https://openairdocs.org/jasc/5312)
- Part: Bulkhead
- Condition: Corroded
- Location: Fuselage
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/TRBACPCP2010023

## Discrepancy

THE FORWARD PRESSURE BULKHEAD HAS CORROSION IN 2 AREAS.  AWAITING COMPLETION OF ATR SRI AND EXECUTIVE ENGINEERING ORDER INSTRUCTIONS FOR CORRECTIVE ACTION TAKEN.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
