# SDR UALA09080602387A

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: August 5, 2009
- Submitted: September 2, 2009
- Operation: Air carrier
- Aircraft: [N647UA](https://openairdocs.org/aircraft/N647UA), registered now
- Make and model: Boeing 767322
- Aircraft serial: 25284
- Aircraft time: 74,984 hours, 12,190 cycles
- Engine: Pwa PW4060
- System (JASC): [2800 · Aircraft Fuel System](https://openairdocs.org/jasc/2800)
- Part: Switch
- Condition: Faulty
- Location: Rt Aux Fuel Tank
- Stage of operation: IN
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/UALA09080602387A

## Discrepancy

CTR AUX OVERRIDE PUMP LOW PRESS LT-ON-, SW-ON-, EICAS MSG CTR L-R FUEL PUMP.  APPROX 1 HR INTO FLT RT MAIN TANK FUEL DECREASED RAPIDLY AS IF RIGHT CENTER PUMP OFF.  CONFIRMED NO LEAK.  NO EXTERNAL LEAKS NOTED.  RAN CENTER TANK PUMPS, OPS CHECK NORMAL ON GROUND, HOWEVER NEEDS MORE TROUBLESHOOTING.  PUMP CONSIDERED INOP.  REPLACED PRESSURE SWITCH S424 FOR RIGHT AUX FUEL TANK.  ALSO REPLACED RELAY K330 RIGHT FUEL PUMP CONTROL.  OPERATIONS CHECKED NORMAL, FUEL TRANSFERRED INTO AND OUT OF CENTER FUEL TANK NORMALLY WITH NO PRESSURE LIGHTS ON UNTIL TANKS WERE EMPTY.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
