# SDR UG82014F00001

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: June 27, 2014
- Submitted: June 27, 2014
- Operation: Air carrier
- Aircraft: [N235EF](https://openairdocs.org/aircraft/N235EF), registered now
- Make and model: Bombdr BD1001A10
- Aircraft serial: 20434
- System (JASC): [2797 · Flight Control System Wiring](https://openairdocs.org/jasc/2797)
- Part: Wire
- Part number: 7WTR3026A22
- Condition: Melted
- Location: Purge Switch
- Stage of operation: NR
- How discovered: 9
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/UG82014F00001

## Discrepancy

WIRES COMING FROM LAVATORY PURGE SWITCH OVERHEATED & MELTED SHEATHING FROM WIRE.  DURING ACCOMPLISHMENT OF LAV WATER SYSTEM 6 MO STERILIZATION.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
