# SDR UHLA2013042100197

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 21, 2013
- Submitted: June 12, 2013
- Operation: Air carrier
- Make and model: Emb ERJ 170-100 SE
- Registry model: [EMB ERJ 170-100 SE](https://openairdocs.org/model/embraer-erj-170-100-se) (OpenAirDocs)
- Aircraft serial: 17000071
- Aircraft time: 23,439 hours, 14,546 cycles
- System (JASC): [5310 · Fuselage Main, Structure](https://openairdocs.org/jasc/5310)
- Part: Structure
- Condition: Corroded
- Location: Zone 100
- Stage of operation: IN
- How discovered: V
- Nature of condition: O
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/UHLA2013042100197

## Discrepancy

THE BEAM UNDER THE FWD PAX DOOR SLIDE FITTING BAR HAS CORROSION.  R & R BEAM.  MAJOR REPAIR

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
