# SDR UIEA2013041600232

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 16, 2013
- Submitted: April 16, 2013
- Operation: Air carrier
- Aircraft: [N640GT](https://openairdocs.org/aircraft/N640GT), registered now
- Make and model: Boeing 767-3S1
- Registry model: [Boeing 767-3S1](https://openairdocs.org/model/boeing-767-3s1) (OpenAirDocs)
- Aircraft serial: 25221
- Aircraft time: 71,510 hours, 15,054 cycles
- System (JASC): [3097 · Ice/Rain Protection System Wiring](https://openairdocs.org/jasc/3097)
- Part: Circuit Breaker
- Condition: Malfunctioned
- Stage of operation: IN
- How discovered: C
- Nature of condition: L
- Precautionary procedure: K
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/UIEA2013041600232

## Discrepancy

PROBE HEAT DISPLAYED ON EICAS.  RECYCLED PROBE HEAT CIRCUT BREAKERS.  OPS CHECKED NORMAL.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
