# SDR UIEA2018022500278

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: February 25, 2018
- Submitted: February 26, 2018
- Operation: Air carrier
- Aircraft: [N640GT](https://openairdocs.org/aircraft/N640GT), registered now
- Make and model: Boeing 767-3S1
- Registry model: [Boeing 767-3S1](https://openairdocs.org/model/boeing-767-3s1) (OpenAirDocs)
- Aircraft serial: 25221
- Aircraft time: 84,949 hours, 18,037 cycles
- System (JASC): [2822 · Fuel Boost Pump](https://openairdocs.org/jasc/2822)
- Part: Pump
- Part number: S343T00229
- Part serial: 2009
- Condition: Failed
- Location: Rt Fuel Boost
- Stage of operation: CR
- How discovered: O
- Nature of condition: O
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/UIEA2018022500278

## Discrepancy

CENTER RT BOOST PUMP CIRCUIT BREAKER TRIPPED.  REPLACED THE BOOST PUMP IAW AMM 28-22-05-404-09-001, OPS CHECKED GOOD.  NO LEAKS.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
