# SDR UIEA2021042701012

- Type: Service difficulty report (as reported; unverified)
- Difficulty date: April 24, 2021
- Submitted: April 28, 2021
- Operation: Air carrier
- Aircraft: [N645GT](https://openairdocs.org/aircraft/N645GT), registered now
- Make and model: Boeing 767324
- Aircraft serial: 27393
- Aircraft time: 101,137 hours, 19,501 cycles
- System (JASC): [2150 · Cabin Cooling System](https://openairdocs.org/jasc/2150)
- Part: Control Valve
- Part number: 3987505
- Part serial: 2990
- Condition: Malfunctioned
- Location: Rt A/C Pack
- Stage of operation: NR
- How discovered: O
- Nature of condition: J
- Precautionary procedure: O
- FAA source: FAA Service Difficulty Reporting System (https://sdrs.faa.gov/)
- Page: https://openairdocs.org/sdr/UIEA2021042701012

## Discrepancy

"R PACK TEMP" EICAS MESSAGE DISPLAYED ACCOMPLISHED QRH(<P>REMOVED & REPLACED PACK TEMP CONTROL VALVE AND OPS CHECK IAW MM 21-51-12.</P>)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain.
